Design and Execution of the Tabaqueira WWTP revamping – Albarraque

Timeline: Revamping installation in 2016, Maintenance and Operation from 2005 to the present

With the goal of improving the final wastewater treatment quality and increasing the flowrate treated, the introduction of a Dissolved Air Flotation allowed to double the treatment capacity, minimizing investment and operation costs.

Besides the maintenance and operation of the WWTP, TEKBOX is responsible for the Reverse Osmosis system, designed to generate boiler feedwater and responsible for the operation of the closed loop water treatment circuits.







 

Subscribe to our newsletter