Dates: Design and Construction in 2012, maintenance and operation up to the present
Design and execution of the WWTP from the Herdade do Marmelo mill – OLIVEIRA DA SERRA, the introduction of coagulation-flocculation allowed the reclamation of the process water for irrigation, minimizing investment and operation costs.
After the project and WWTP execution, TEKBOX assumed the Maintenance and Operation of the system.
In 2013, we performed some research and innovation with the aim of improving efficiency, seeking a 100% wastewater and solids reclamation perspective, minimizing waste.