Revamping of the biogas circuits of the Guia WWTP – solid phase treatment plant – Alcabideche

Timeline: 2012/2013



In this project TEKBOX assumed responsibility in two phases:

Phase 1 - Engineering Services
Technical engineering evaluation for the design of the remodeling of the biogas line in order to improve the functioning and reduce maintenance issues. 
An audit took place for the technical fitting of the ATEX directive installations

Phase 2 – Technical services – Construction
Revamping construction of the 316L stainless steel piping, from the biogas line, with the reinstallation of valves and instrumentation aimed at improving the operational system and fitting according to ATEX standards;

 





 