Timeline: Design in 2011, Installation in 2012, Maintenance and Operation up to the present
Design and installation of the Winery WWTP, with: Equalization lagoon, SBR (Sequencing Batch Reactor), pH neutralization, flowmeters. Supply and installation of piping, pumping, instrumentation and global command electrical box with all automation and control
.